News
Bengaluru: The long-delayed Yellow Line of Namma Metro, meant to link RV Road with Electronics City, has become the latest ...
The 19.15 km line will enhance connectivity, passing key points. Currently, three trains will operate at 25-minute intervals, ...
Public outcry grows as Namma Metro's Yellow Line faces yet another delay, sparking criticism and protest over constant ...
The much-awaited Yellow Line of Bengaluru’s Namma Metro, stretching 19.15 km from RV Road to Bommasandra, has faced repeated ...
Bengaluru: The long-delayed opening of Namma Metro's Yellow Line has taken a political twist, with the ruling Congress and ...
16h
India Today on MSNTejasvi Surya calls for protest march over Bengaluru Metro's delayed Yellow LineBangalore South MP Tejasvi Surya has called out BMRCL over the prolonged delay in launching the Yellow Line metro. He urged ...
1don MSN
Bengaluru's Namma Metro Yellow Line, an 18.8 km elevated stretch connecting RV Road to Bommasandra, is nearing completion ...
Bengaluru’s Namma Metro Yellow Line is set to open in early August with limited trains, pending safety approvals, covering 16 ...
The 19.15-kilometre-long Yellow Line will connect RV Road with Bommasandra and will traverse several major parts of the city, ...
Yellow Line to open in August post safety inspection; BMRCL prepares for launch with limited trains and driverless tech.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results